工业环氧地坪漆在施工前的准备工作是什么

产业环氧地坪漆在施工前需求查验哪些细活?环氧地坪漆涂料涂装前当面材品质实行查验,以便左证地面境况设计合理的涂装策划和重点采纳一些品质操纵举动.通常应查验的名目如下:一、地面平整度:用2米直尺查验,纪录空隙值,对地面过高处实行符号,以便重点打磨,对过低处采取泥浆修理.

What kind of fine work does industrial epoxy floor need to be checked before construction? The quality of the face material before coating is checked so as to design reasonable painting plan and adopt some quality control actions. Usually the items to be checked are as follows: 1. Ground smoothness: checking with 2-meter ruler, recording the void value, and checking the ground. Symbols are applied at high places to focus on grinding and to repair mud at low locations.

二、基材含水量查验:应向客户相识混凝土已养护多久了,底层存不存在施工防水层,在养护时期的气候境况等.通常来说,夏代好天透风优良时的楼上15天养护限期就不妨了,冬天,水季养护期应长些.通常需约1个月.在施工前采取混凝土含水率丈量仪对基材含水率实行丈量是必要的,对丈量点采取如下规定采用:A、底层(一楼);B、迫近门窗或外墙处;C、片面在混凝土浇铸竣工后沾过水的地方,D、落水管、排水沟等旁边.如没有丈量仪,采取薄膜笼罩法也很有用,要点是薄膜必需不行漏气并要贴地密封紧密.

2. Inspection of moisture content of base material: It is necessary to know how long concrete has been maintained from customers, there is no construction waterproof layer at the bottom, and the climate condition during the maintenance period. Generally speaking, the 15-day maintenance period for upper buildings in good weather and good ventilation in Xia Dynasty is not bad. In winter, the maintenance period in water season should be longer. Usually, it takes about one month to adopt coagulation before construction. It is necessary to measure the moisture content of the base material by soil moisture meter. The following rules should be adopted for measuring points: A, bottom floor (first floor); B, near doors and windows or external walls; C, one-sided where water has been dipped after the completion of concrete casting, besides D, downspout and drainage ditch. If there is no measuring instrument, it is also useful to adopt film covering method, and the main points are as follows. The film must be leak free and tightly sealed.

三、、混凝土强度查验:首要查验混凝土口头可否有起砂征象,片面可否的空鼓征象,地面哪里有钢筋类物资(机械打磨时如不留意易损害机械),继而一一标注并纪录.对强度特差的混凝土,办理时应格外留意,这样地面打磨用处不大,而涂装前透顶吸尘倒很要紧,吸尘后再用无溶剂底榉(调释下更佳,有利于增补浸透力)打底,使之尽管长远浸透,反响固化后锚固混凝土.

3. Strength inspection of concrete: First of all, it is necessary to inspect whether concrete has sand-raising signs orally, one-sided empty drum signs, and where there are reinforcing steel materials on the ground (if not paying attention to damage machinery when mechanical polishing), and then mark and record them one by one. When handling concrete with very poor strength, special attention should be paid to it, so that ground polishing is not very useful, and the ground polishing is not very useful. It is very important to vacuum through the top before painting. After vacuum cleaning, solventless beech is used to make the bottom, even though it is immersed in the long run, to anchor the concrete after reaction solidification. 四、其他方面的查验:因环氧树脂地坪施工需求清洁闭塞的涂装境遇,任何每个细活的疏忽都或许变成返工或欠缺,变成亏损,所以在入场施工前需查验下面方面:A、门窗可否已完整,屋面、水管等可否有漏水隐患;B、照明、泄电等设施可否完备,如需自备,应策划好,C.拟施工时期的气候境况.

4. Examination of other aspects: because of the situation of clean and blocked coating for epoxy floor construction, any careless negligence may turn into rework or deficiency and become loss. Therefore, before entering the construction site, the following aspects should be checked: whether the doors and windows are complete, whether the roof, water pipe, etc. have potential leakage hazards; B, lighting, electricity leakage, etc. Whether it can be completed or not, if necessary, we should plan the climate of C. during construction.